Categories: Whitepapers

The Samcheok project from KOSPO and Foster Wheeler

[wpdm_file id=1]

‘Moving Mountains for Green Energy’ is the exclusive white paper download depicting the story of Korea Southern Power Companies Samcheok project, the world’s biggest and most advanced CFB power plant. This development includes one of the most ambitious boiler installations to date with world class engineering conglomerate Foster Wheeler delivering  4 x 550 MW ultra-supercritical units. Vice President of Strategic Business Planning and Development Mr. Bob Giglio talks about the project, the challenges and the technical details of this potentially game changing construction.

Pimagazine Asia Admin

Share
Published by
Pimagazine Asia Admin

Recent Posts

Insuring Wind Turbines, What is the Risk?

Gallagher Re has shed light on the significant challenges insurers face when providing coverage for…

2 months ago

ARENA Start Feasibility Study in Western Australia

The Australian government will disburse AUD 1.7 million (USD 1.1m/EUR 1m) in grant funding to…

2 months ago

Asia moving away from Solar?

GlobalData’s latest report, ‘Asia Pacific Renewable Energy Policy Handbook 2024’ is among the latest region-specific…

2 months ago

Asia’s Energy Challenge 2024

The electrical generation market is facing a number of challenges, including the need to increase…

2 months ago

Powering Progress: Nuclear Energy’s Role in Asia’s Energy Landscape

Nuclear energy has emerged as a prominent player in Asia's energy landscape, offering a reliable…

7 months ago

Charting a Cleaner Path: Carbon Capture and Storage in Asia

The pursuit of a low-carbon future has gained significant momentum globally, and Asia stands tall…

7 months ago