Categories: NewsPower Generation

NTPC receive huge boost with expectation of coal production at six blocks by 2017

State-run power major NTPC said it expects to start production at its six coal blocks by 2017, which will help it secure an additional 40 million tonne of captive coal.

The six coal blocks include Pakri Barwadih, Chatti-Bariatu, Kerandari, and Chatti-Bariatu (South) in Jharkhand; Tallaipali in Andhra and Dulanga in Odisha.

“One of the mines in Jharkhand is expected to start production this year. We expect to start production in all the six mines by 2017,” NTPC Technical Director A K Jha told reporters on the sidelines of an event here.

He said, once these six mines start production, the company will be able to add nearly 40 million tonnes of capacity for captive use.

Last year, the Coal Ministry had cancelled allocation of five blocks — Chatti Bariatu, Chatti Bariatu (South), Kerandari, Brahmani and Chichiro Patsimal — to NTPC as it could not develop the mines within the stipulated timeframe.

However, in January, the ministry decided to return the Chatti Bariatu, Chatti Bariatu (South) and Kerandari coal blocks to the nation’s largest utility.

Jha further said the 800-mw Kol Dam hydel project in Himachal is expected to be commissioned this fiscal.

Besides, he said that NTPC was planning to commission 100 mw of solar power projects this year.

“We are setting up solar power projects in different states, which are at various stages of development. We expect to commission nearly 100 mw by March next,” Jha said.

It is setting up 50 mw solar plant at Raigarh in Madhya Pradesh, 5 mw at Faridabad (Harayana), 10 mw at Talcher (Odisha), 10 mw at Unchahar and 25 mw at Singrauli (UP) and 25 mw in Ramagundam (Andhra).

Pimagazine Asia Admin

Recent Posts

Insuring Wind Turbines, What is the Risk?

Gallagher Re has shed light on the significant challenges insurers face when providing coverage for…

2 months ago

ARENA Start Feasibility Study in Western Australia

The Australian government will disburse AUD 1.7 million (USD 1.1m/EUR 1m) in grant funding to…

2 months ago

Asia moving away from Solar?

GlobalData’s latest report, ‘Asia Pacific Renewable Energy Policy Handbook 2024’ is among the latest region-specific…

2 months ago

Asia’s Energy Challenge 2024

The electrical generation market is facing a number of challenges, including the need to increase…

2 months ago

Powering Progress: Nuclear Energy’s Role in Asia’s Energy Landscape

Nuclear energy has emerged as a prominent player in Asia's energy landscape, offering a reliable…

8 months ago

Charting a Cleaner Path: Carbon Capture and Storage in Asia

The pursuit of a low-carbon future has gained significant momentum globally, and Asia stands tall…

8 months ago