!-- Hotjar Tracking Code for www.pimagazine-asia.com -->
You Are Here: Home » News » Alstom win South Korea Wind project

Alstom win South Korea Wind project

Alstom has been awarded a contract by DaeMyoung Energy Corporation, subsidiary company of DaeMyoung GEC, a large engineering and construction services company in South Korea to provide wind turbines for Gowon wind farm. The wind farm is located in Gangwon province approximately 170km east of Seoul. Alstom will supply and supervise the installation and commissioning of 6 units of the ECO 110 Wind Turbines with 90m towers, each with an output of 3MW. When operational, the wind farm will have a capacity of 18MW.

The ECO 110 is equipped with Alstom pure Torque technology which protects the transmission chain by diverting unwanted stresses from the wind to the turbine’s tower and thereby optimising performance. Exclusively developed by Alstom and deployed throughout its entire range of wind turbines, this technology increases the reliability and durability of each turbine. In addition, the nacelle’s specific design made up of three independent elements and of large dimensions, facilitates maintenance operations and safety inside of the machine.

The Gowon wind farm, the second secured by Alstom in Korea this year1, will be fully operational by the end of 2015 and is set to support Korea’s aim to have renewable energy account for 20% of total electricity generated by 2020. With a population exceeding 50 million and limited domestic energy sources, coupled with huge demand, South Korea relies on imported sources for 96% of its energy supply.

The Gowon wind farm will be operated by joint owners Eurus Energy Holdings Corporation (Eurus Energy) and DaeMyoung Energy Corporation. Eurus Energy is a leading Independent Power Producer in Japan with over 2000 MW in operating assets. Alstom has supplied wind turbines for Eurus Energy’s Satomi Wind Farm and is currently supplying turbines to Kawazu Wind Farm in Japan.

“We are pleased to be a part of Korea’s dedication to increasing its renewable energy footprint. This opportunity is significant as it will represent our continued presence for Wind Power in Korea and also working with our important customer Eurus Energy.” said Yves Rannou, Senior Vice President, Wind.

Alstom has been present in South Korea for over 45 years having supplied to over 34% of hydro plants as well as the first TGV export systems solution in the KTX Project and the first one was to supply 10 units of the ECO 110 onshore wind turbines to Gimnyeong wind farm.

About Alstom

Alstom is a global leader in the world of power generation, power transmission and rail infrastructure and sets the benchmark for innovative and environmentally friendly technologies. Alstom builds the fastest train and the highest capacity automated metro in the world, provides turnkey integrated power plant solutions and associated services for a wide variety of energy sources, including hydro, nuclear, gas, coal and wind, and it offers a wide range of solutions for power transmission, with a focus on smart grids. The Group employs 93,000 people in around 100 countries. It had sales of over €20 billion and booked €21.5 billion in orders in 2013/14.

Press information

Cecile Dodat (Alstom Renewable Power) – Tel +33 1 47 49 79 42

cecile.dodat@alstom.com

Julie Khoo (Alstom Singapore & East Asia) – Tel +65 6236 1575

julie.khoo@alstom.com Website www.alstom.com,

Leave a Comment

© 2023 POWER INSIDER PUBLISHING & EVENTS LIMITED - ALL RIGHTS RESERVED

Scroll to top
G-CVB2JBXG1C